| Sl. No. | Particulars of Test | Rates in Rs. Charged by ARRTI/ Test | Rates charged by Other Laboratories |
|---|---|---|---|
| Soil Survey Section | |||
| 1. | Direct Shear Test | 173 | 600 |
| 2. | Triaxial Compression Test | 77 | 900 |
| 3. | Consolidation Test | 777 | 1200 |
| 4. | Particle Size analysis (wet test) | 105 | 300 |
| 5. | Particle Size analysis (dry test) | 91 | 210 |
| 6. | Specific gravity | 98 | 200 |
| 7. | Moisture Content | 42 | 60 |
| Soil Section | |||
| 1. | Sieve Analysis | 91 | 210 |
| 2. | Limit Tests | 231 | 500 |
| 3. | Proctor Test | 473 | 600 |
| 4. | CBR Test | 1001 | 1000 |
| Bitumen Section | |||
| 1. | Bitumen Content | 784 | |
| 2. | Ductility Test | 266 | 400 |
| 3. | Softening Test | 305 | 625 |
| 4. | Penetration Test | 280 | 625 |
| 5. | Mix Design | 3643 | 4200 |
| Cement Section | |||
| 1. | Tensile Strength of Steel | 300 | _ |
| 2. | Bending and Rebending | 350 | _ |
| 3. | Compressive strength of concrete cube | 76 | 250 |
| 4. | Compressive strength of bricks | 151 | _ |
| 5. | Concrete mix design | 5000 | 6000 |
| 6. | Compressive strength of cement moulding | 151 | 1350 (including moulding & curing) |
| 7. | Soundness test of cement | 289 | 550 |
| 8. | Setting time of cement | 136 | 750 |
| 9. | Fineness test of cement | 318 | 520 |
| 10. | Flexural strength of concrete | 76 | |
| Aggregate Section | |||
| 1. | Aggregate impact value test | 287 | 390 |
| 2. | Crushing value test | 371 | 425 |
| 3. | Los Angles abrasion value test | 335 | 715 |
| 4. | Flakiness and elongation test | 223 | 410 |
| 5. | Grading test | 260 | 250 |
| 6. | Density test | 132 | 80 |
| 7. | Specific gravity test | 157 | 200 |
| 8. | Water absorption test | 161 | 120 |